Assessment Year | 2006 |
---|---|
Principal Product | fabricated metal structures |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3449: Miscellaneous Structural Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
214,000
ft2
|
Annual Production | 800,000
lb
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,841 | 1,509,630 |
kWh
|
$0.038 |
Electricity Demand | $40,165 | 5,467 |
kW-mo/yr
|
$7.35 |
Electricity Fees | $3,765 | - |
|
- |
LPG | $29,500 | 1,551 |
MMBtu
|
$19.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,463 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $1,898 | - |
$1,898
35,776
kWh
|
- | - | - | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,341 | $500 |
$4,233
-
kWh
|
$2,894
-
kW-mo/yr
|
$214 | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,010 | $50 |
$462
11,896
kWh
|
$268
-
kW-mo/yr
|
- | - | - | $280 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $919 | $803 |
$362
9,953
kWh
|
$557
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.1331: Burn a less expensive grade of fuel | $11,070 | $25,000 | - | - | - |
$11,070
-
MMBtu
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $1,252 | $3,726 | - | - | - |
$1,252
-
MMBtu
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $211 | $100 |
$137
2,585
kWh
|
$74
-
kW-mo/yr
|
- | - | - | - | |
08 | 4.322: Eliminate old stock and modify inventory control | $30,479 | $21,000 | - | - | - | - | $14,900 | $15,579 | |
TOTAL RECOMMENDED | $54,180 | $51,179 |
$7,092
60,210
kWh
|
$3,793
-
kW-mo/yr
|
$214 |
$12,322
-
MMBtu
|
$14,900 | $15,859 | ||
TOTAL IMPLEMENTED | $1,463 | $3,826 |
$137
2,585
kWh
|
$74
-
kW-mo/yr
|
- |
$1,252
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs