Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,642

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fabricated metal product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TR0061 #05 Y:2024 Reduce illumination to minimum necessary levels $1,297 $728
TR0061 #04 Y:2024 Replace existing hvac unit with high efficiency model $16,588 $55,200
TR0061 #03 Y:2024 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,219 $4,350
TR0061 #02 Y:2024 Cool compressor air intake with heat exchanger $9,288 $17,929
TR0061 #01 Y:2024 Use solar heat to make electricty $121,083 $551,388
NL0105 #05 Y:2024 Meter waste water $794 $950
NL0105 #04 Y:2024 Change rate schedules or other changes in utility service $2,197 $40
NL0105 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $10,009 $9,991
NL0105 #02 Y:2024 Upgrade obsolete equipment $22,584 $145,801
NL0105 #01 Y:2024 Upgrade obsolete equipment $76,412 $216,424
NL0104 #06 Y:2024 Install occupancy sensors $126 $239
NL0104 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $365 $656
NL0104 #04 Y:2024 Install compressor air intakes in coolest locations $1,235 $500
NL0104 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,482 $490
NL0104 #02 Y:2024 Recharge batteries on during off-peak demand periods $3,070 $450
NL0104 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $5,739 $4,500
UD1100 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,007 $15,430
UD1100 #07 Y:2024 Install occupancy sensors $5,242 $7,768
UD1100 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $3,587 -
UD1100 #05 Y:2024 Optimize plant power factor $12,387 $23,400