Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,795

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fabricated metal product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1137 #10 Y:2025 Clean and maintain refrigerant condensers and towers $1,857 $3,900
OK1137 #09 Y:2025 Install or upgrade insulation on hvac distribution systems $1,109 $2,120
OK1137 #08 Y:2025 Conserve energy by efficient use of vending machines $558 $410
OK1137 #07 Y:2025 Combine utility meters $682 $80
OK1137 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,920 $6,940
OK1137 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,886 $1,320
OK1137 #04 Y:2025 Optimize plant power factor $3,482 $11,190
OK1137 #03 Y:2025 Use solar heat to make electricty $31,249 $160,056
OK1137 #02 Y:2025 Install occupancy sensors $520 $1,286
OK1137 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $641 $985
DL0256 #08 Y:2025 Use heat pump for space conditioning $25,337 $50,000
DL0256 #07 Y:2025 Use or replace with energy efficient substitutes $1,219 $5,200
DL0256 #06 Y:2025 Recover waste heat from equipment $589 $3,250
DL0256 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,171 $16,500
DL0256 #04 Y:2025 Utilize controls to operate equipment only when needed $16,477 $10,000
DL0256 #03 Y:2025 Utilize controls to operate equipment only when needed $2,894 $5,000
DL0256 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,828 $5,900
DL0256 #01 Y:2025 Turn off equipment during breaks, reduce operating time $1,286 -
TT0333 #08 Y:2025 Utilize energy-efficient belts and other improved mechanisms $596 $1,186
TT0333 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,569 $3,000