TR0061 #05 Y:2024 | 05 | 2024 | Reduce illumination to minimum necessary levels | $1,297 | $728 |
n/a
|
TR0061 #04 Y:2024 | 04 | 2024 | Replace existing hvac unit with high efficiency model | $16,588 | $55,200 |
n/a
|
TR0061 #03 Y:2024 | 03 | 2024 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $2,219 | $4,350 |
n/a
|
TR0061 #02 Y:2024 | 02 | 2024 | Cool compressor air intake with heat exchanger | $9,288 | $17,929 |
n/a
|
TR0061 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $121,083 | $551,388 |
n/a
|
NL0105 #05 Y:2024 | 05 | 2024 | Meter waste water | $794 | $950 |
n/a
|
NL0105 #04 Y:2024 | 04 | 2024 | Change rate schedules or other changes in utility service | $2,197 | $40 |
n/a
|
NL0105 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $10,009 | $9,991 |
n/a
|
NL0105 #02 Y:2024 | 02 | 2024 | Upgrade obsolete equipment | $22,584 | $145,801 |
n/a
|
NL0105 #01 Y:2024 | 01 | 2024 | Upgrade obsolete equipment | $76,412 | $216,424 |
n/a
|
NL0104 #06 Y:2024 | 06 | 2024 | Install occupancy sensors | $126 | $239 |
n/a
|
NL0104 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $365 | $656 |
n/a
|
NL0104 #04 Y:2024 | 04 | 2024 | Install compressor air intakes in coolest locations | $1,235 | $500 |
n/a
|
NL0104 #03 Y:2024 | 03 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $1,482 | $490 |
n/a
|
NL0104 #02 Y:2024 | 02 | 2024 | Recharge batteries on during off-peak demand periods | $3,070 | $450 |
n/a
|
NL0104 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,739 | $4,500 |
n/a
|
UD1100 #08 Y:2024 | 08 | 2024 | Utilize higher efficiency lamps and/or ballasts | $5,007 | $15,430 |
n/a
|
UD1100 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $5,242 | $7,768 |
n/a
|
UD1100 #06 Y:2024 | 06 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $3,587 | - |
n/a
|
UD1100 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $12,387 | $23,400 |
n/a
|