Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,876

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fabricated metal product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0681 #08 Y:2025 Eliminate or reduce compressed air usage $308 $675
WV0681 #07 Y:2025 Establish a predictive maintenance program $1,642 $5,200
WV0681 #06 Y:2025 Insulate bare equipment $1,989 $4,797
WV0681 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,725 $848
WV0681 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,385 $5,940
WV0681 #03 Y:2025 Analyze flue gas for proper air/fuel ratio $9,352 $3,890
WV0681 #02 Y:2025 Develop a repair/replace policy $9,972 $8,140
WV0681 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $27,629 $34,630
MU0066 #09 Y:2025 Use solar heat to make electricty $59,971 $561,792
MU0066 #08 Y:2025 Use proper thickness of insulation on building envelope $116 $193
MU0066 #07 Y:2025 Use proper thickness of insulation on building envelope $251 $242
MU0066 #06 Y:2025 Install vinyl strip / high speed / air curtain doors $4,303 $4,440
MU0066 #05 Y:2025 Close holes and openings in building such as broken windows $189 $627
MU0066 #04 Y:2025 Replace existing hvac unit with high efficiency model $49,773 $560,225
MU0066 #03 Y:2025 Use photocell controls $302 $550
MU0066 #02 Y:2025 Use separate switches on perimeter lighting which may be turned off when natural light is available $762 $362
MU0066 #01 Y:2025 Turn off equipment when not in use $226 -
MZ0375 #09 Y:2025 Upgrade obsolete equipment $544,334 $2,410,000
MZ0375 #08 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $7,435 $12,750
MZ0375 #07 Y:2025 Use solar heat to make electricty $34,746 $214,502