Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonferrous metal die-casting foundries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0164 #08 Y:2021 Use fog nozzles / spray rinsing instead of immersion rinsing $633 $1,500
WM0164 #07 Y:2021 Install occupancy sensors $1,093 $720
WM0164 #06 Y:2021 Install compressor air intakes in coolest locations $1,833 $1,945
WM0164 #05 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,300 $3,750
WM0164 #04 Y:2021 Use waste heat from hot flue gases to preheat $3,231 $14,000
WM0164 #03 Y:2021 Use waste heat from hot flue gases to preheat $3,588 $7,000
WM0164 #02 Y:2021 Use solar heat to make electricty $9,078 $94,182
WM0164 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $18,235 $31,198
WM0110 #12 Y:2017 Install occupancy sensors $277 $115
WM0110 #11 Y:2017 Conserve energy by efficient use of vending machines $406 $720
WM0110 #10 Y:2017 Use photocell controls $806 $360
WM0110 #09 Y:2017 Utilize higher efficiency lamps and/or ballasts $839 $790
WM0110 #08 Y:2017 Utilize higher efficiency lamps and/or ballasts $934 $600
WM0110 #07 Y:2017 Utilize energy-efficient belts and other improved mechanisms $4,106 $1,240
WM0110 #06 Y:2017 Use radiant heater for spot heating $12,095 $7,260
WM0110 #05 Y:2017 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $25,591 $50,000
WM0110 #04 Y:2017 Insulate bare equipment $38,561 $90,000
WM0110 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $52,832 $23,000
WM0110 #02 Y:2017 Use waste heat from hot flue gases to preheat $53,190 $56,000
WM0110 #01 Y:2017 Change rate schedules or other changes in utility service $92,862 $250,000