21
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0288 #14 Y:2003 | 14 | 2003 | Install compressor air intakes in coolest locations | $95 | $200 | |
| WV0288 #13 Y:2003 | 13 | 2003 | Chill water to the highest temperature possible | $203 | $25 | |
| WV0288 #12 Y:2003 | 12 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $804 | $1,100 | |
| WV0288 #11 Y:2003 | 11 | 2003 | Use adjustable frequency drive or multiple speed motors on existing system | $2,876 | $3,500 | |
| WV0288 #10 Y:2003 | 10 | 2003 | Use / purchase optimum sized compressor | $3,739 | $575 | |
| WV0288 #09 Y:2003 | 09 | 2003 | Reduce the pressure of compressed air to the minimum required | $3,932 | $50 | |
| WV0288 #08 Y:2003 | 08 | 2003 | Utilize higher efficiency lamps and/or ballasts | $4,040 | $3,210 | |
| WV0288 #07 Y:2003 | 07 | 2003 | Develop a repair/replace policy | $4,573 | $1,000 | |
| WV0288 #06 Y:2003 | 06 | 2003 | Replace obsolete burners with more efficient ones | $5,772 | $27,600 | |
| WV0288 #05 Y:2003 | 05 | 2003 | Use waste heat from flue gases to heat space conditioning air | $6,212 | $1,200 | |
| WV0288 #04 Y:2003 | 04 | 2003 | Reduce illumination to minimum necessary levels | $8,061 | $250 | |
| WV0288 #03 Y:2003 | 03 | 2003 | Use or replace with energy efficient substitutes | $9,120 | $700 | |
| WV0288 #02 Y:2003 | 02 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,141 | $360 | |
| WV0288 #01 Y:2003 | 01 | 2003 | Use waste heat from hot flue gases to preheat | $12,469 | $2,195 | |
| MA0537 #07 Y:2003 | 07 | 2003 | Reduce the pressure of compressed air to the minimum required | $154 | - | |
| MA0537 #06 Y:2003 | 06 | 2003 | Install occupancy sensors | $464 | $150 | |
| MA0537 #05 Y:2003 | 05 | 2003 | Use cooling tower water instead of refrigeration | $1,043 | $3,500 | |
| MA0537 #04 Y:2003 | 04 | 2003 | Utilize higher efficiency lamps and/or ballasts | $2,446 | $10,396 | |
| MA0537 #03 Y:2003 | 03 | 2003 | Reschedule plant operations or reduce load to avoid peaks | $11,180 | $8,000 | |
| MA0537 #02 Y:2003 | 02 | 2003 | Adopt in-house material generation | $61,752 | $240,000 |