| Assessment Year | 2003 |
|---|---|
| Principal Product | Non-ferrous wire |
| NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
| SIC | 3357: Drawing and Insulating of Nonferrous Wire |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
105,000
ft2
|
| Annual Production | 30,000,000
lb
|
| Production Hrs. Annual | 6,200
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $200,952 | 3,606,400 |
kWh
|
$0.056 |
| Electricity Demand | $85,665 | 10,320 |
kW-mo/yr
|
$8.30 |
| Natural Gas | $53,433 | 63,325 |
MMBtu
|
$0.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $171,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,064 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $94,545 | $112,240 |
$121,641
2,145,000
kWh
|
$39,928
-
kW-mo/yr
|
$(-67,024.0)
-
MMBtu
|
- | - | |
| 02 | 4.212: Adopt in-house material generation | $61,752 | $240,000 |
$(-9,894.0)
(-174,600)
kWh
|
$(-15,165.0)
-
kW-mo/yr
|
- | $87,811 | $(-1,000.0) | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,180 | $8,000 | - |
$11,180
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,446 | $10,396 |
$2,198
15,200
kWh
|
$248
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.2612: Use cooling tower water instead of refrigeration | $1,043 | $3,500 |
$1,043
18,400
kWh
|
- | - | - | - | |
| 06 | 2.7135: Install occupancy sensors | $464 | $150 |
$464
7,600
kWh
|
- | - | - | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $154 | - |
$154
3,200
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $171,584 | $374,286 |
$115,606
2,014,800
kWh
|
$36,191
-
kW-mo/yr
|
$(-67,024.0)
-
MMBtu
|
$87,811 | $(-1,000.0) | ||
| TOTAL IMPLEMENTED | $3,064 | $10,546 |
$2,816
26,000
kWh
|
$248
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs