Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

611

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonferrous metal (except aluminum) production and processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0335 #07 Y:2025 Eliminate or reduce compressed air usage $7,762 $15,500
IC0335 #06 Y:2025 Install an uninteruptable power supply $49,315 $61,000
IC0335 #05 Y:2025 Install compressor air intakes in coolest locations $2,550 $760
IC0335 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,411 $10,063
IC0335 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $599 $1,500
IC0335 #02 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $132,338 $199,240
IC0335 #01 Y:2025 Use solar heat to make electricty $128,644 $588,331
SU0583 #10 Y:2025 Adjust / maintain fork lift trucks for most efficient operation $11,245 $52,500
SU0583 #09 Y:2025 Install occupancy sensors $1,698 $5,771
SU0583 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,591 $8,145
SU0583 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,515 $16,180
SU0583 #06 Y:2025 Install compressor air intakes in coolest locations $5,852 $1,031
SU0583 #05 Y:2025 Apply for tax-free status for energy purchases $1,399 $65
SU0583 #04 Y:2025 Use or replace with energy efficient substitutes $1,190 $42
SU0583 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,856 $28
SU0583 #02 Y:2025 Eliminate or reduce compressed air usage $6,650 -
SU0583 #01 Y:2025 Disconnect ballasts $1,914 -
UU0256 #04 Y:2024 Reduce excessive boiler blowdown $5,024 $7,960
UU0256 #03 Y:2024 Use heat from boiler blowdown to preheat boiler feed water $8,048 $11,730
UU0256 #02 Y:2024 Optimize plant power factor $14,319 $31,625