Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

594

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonferrous metal (except aluminum) production and processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0256 #04 Y:2024 Reduce excessive boiler blowdown $5,024 $7,960
UU0256 #03 Y:2024 Use heat from boiler blowdown to preheat boiler feed water $8,048 $11,730
UU0256 #02 Y:2024 Optimize plant power factor $14,319 $31,625
UU0256 #01 Y:2024 Use / purchase optimum sized compressor $43,875 $401,481
OR0789 #05 Y:2024 Install common header on compressors $16,245 $4,904
OR0789 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $985 -
OR0789 #03 Y:2024 Replace fossil fuel equipment with electrical equipment $4,115 $1,800
OR0789 #02 Y:2024 Optimize plant power factor $1,616 $14,338
OR0789 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,513 -
SU0549 #12 Y:2024 Use solar heat to make electricty $15,973 $156,925
SU0549 #11 Y:2024 Install vinyl strip / high speed / air curtain doors $137 $930
SU0549 #10 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,941 $4,620
SU0549 #09 Y:2024 Conserve energy by efficient use of vending machines $899 $1,526
SU0549 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,028 $792
SU0549 #07 Y:2024 Replace fossil fuel equipment with electrical equipment $21,453 $15,000
SU0549 #06 Y:2024 Eliminate or reduce compressed air usage $9,776 $995
SU0549 #05 Y:2024 Recover waste heat from equipment $4,448 $390
SU0549 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $956 $35
SU0549 #03 Y:2024 Use or replace with energy efficient substitutes $1,737 $25
SU0549 #02 Y:2024 Recharge batteries on during off-peak demand periods $7,711 -