Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Steel wire drawing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0702 #10 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $892 $114
UD0702 #09 Y:2004 Reduce the pressure of compressed air to the minimum required $1,215 $600
UD0702 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $2,961 $92
UD0702 #07 Y:2004 Upgrade controls on compressors $3,625 -
UD0702 #06 Y:2004 Size electric motors for peak operating efficiency $5,969 $3,010
UD0702 #05 Y:2004 Minimize overflows by installing level controls $11,155 $11,025
UD0702 #04 Y:2004 Utilize higher efficiency lamps and/or ballasts $25,166 $106,664
UD0702 #03 Y:2004 Use fixtures to reduce machine changeout times $25,611 $10,795
UD0702 #02 Y:2004 Change product design to reduce energy requirements $33,150 $13,800
UD0702 #01 Y:2004 Change procedures / equipment / operating conditions $111,296 $120,000
UD0700 #16 Y:2004 Upgrade controls on compressors $588 $500
UD0700 #15 Y:2004 Insulate bare equipment $604 $1,575
UD0700 #14 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $706 $243
UD0700 #13 Y:2004 Reduce fluid flow rates $774 $850
UD0700 #12 Y:2004 Use waste heat from hot flue gases to preheat $850 $328
UD0700 #11 Y:2004 Eliminate or reduce compressed air usage $1,104 $700
UD0700 #10 Y:2004 Size electric motors for peak operating efficiency $1,258 $1,405
UD0700 #09 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,471 $4,116
UD0700 #08 Y:2004 Install timers on light switches in little used areas $2,312 $8,302
UD0700 #07 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $2,656 $3,000