ITAC Assessment: UD0702
ITAC logo
ITAC Assessment: UD0702
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fabricated Sheet Metal Parts, Telescoping Masts
NAICS 331222: Steel Wire Drawing
SIC 3343:
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 279,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,471 5,056,538
kWh
Natural Gas $206,150 24,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $221,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings
01 3.1191: Change procedures / equipment / operating conditions $111,296 $120,000 - $(-7,368.0)
-
kW-mo/yr
$53,924
-
MMBtu
- $6,240 $58,500
02 2.5195: Change product design to reduce energy requirements $33,150 $13,800 - - $33,150
-
MMBtu
- - -
03 4.621: Use fixtures to reduce machine changeout times $25,611 $10,795 - - - - $25,611 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $25,166 $106,664 $21,062
583,440
kWh
$4,104
-
kW-mo/yr
- - - -
05 3.7222: Minimize overflows by installing level controls $11,155 $11,025 - - - $11,155
-
Tgal
- -
06 2.4131: Size electric motors for peak operating efficiency $5,969 $3,010 $3,942
109,200
kWh
$2,027
-
kW-mo/yr
- - - -
07 2.4224: Upgrade controls on compressors $3,625 - $2,361
65,395
kWh
$1,264
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,961 $92 $2,478
68,640
kWh
$483
-
kW-mo/yr
- - - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,215 $600 $791
21,915
kWh
$424
-
kW-mo/yr
- - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $892 $114 $757
20,966
kWh
$135
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $221,040 $266,100 $31,391
869,556
kWh
$1,069
-
kW-mo/yr
$87,074
-
MMBtu
$11,155
-
Tgal
$31,851 $58,500
TOTAL IMPLEMENTED $33,089 $11,001 $5,596
155,001
kWh
$1,882
-
kW-mo/yr
- - $25,611 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings