Assessment Year | 1992 |
---|---|
Principal Product | WET GROUND MICA |
NAICS |
n/a
|
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $1 M to 5M |
# of Employees | 52 |
Plant Area |
n/a
|
Annual Production | 5,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $367,746 | 6,561,548 |
kWh
|
$0.056 |
LPG | $41,358 | 4,761 |
MMBtu
|
$8.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,403 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,403 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,414 | $300 | - |
$5,714
-
MMBtu
|
$(-300.0) | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $4,427 | $10,500 | - |
$4,427
-
MMBtu
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $5,200 | $1,000 | - |
$5,200
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $13,398 | $7,605 | - |
$13,398
-
MMBtu
|
- | |
05 | 2.2163: Use minimum steam operating pressure | $499 | - | - |
$499
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,164 | $2,200 |
$1,279
22,860
kWh
|
- | $(-115.0) | |
07 | 2.4133: Use most efficient type of electric motors | $5,618 | $78,930 |
$5,618
100,234
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,010 | - |
$7,010
125,147
kWh
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,673 | $3,500 |
$7,673
137,163
kWh
|
- | - | |
TOTAL RECOMMENDED | $50,403 | $104,035 |
$21,580
385,404
kWh
|
$29,238
-
MMBtu
|
$(-415.0) | ||
TOTAL IMPLEMENTED | $50,403 | $104,035 |
$21,580
385,404
kWh
|
$29,238
-
MMBtu
|
$(-415.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs