Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Rolled steel shape manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0332 #10 Y:2011 Utilize higher efficiency lamps and/or ballasts $706 $4,580
LE0332 #09 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $3,360 $6,400
LE0332 #08 Y:2011 Reduce the pressure of compressed air to the minimum required $3,829 $40
LE0332 #07 Y:2011 Develop standard operating procedures $6,689 -
LE0332 #06 Y:2011 Install vinyl strip / high speed / air curtain doors $7,328 $23,400
LE0332 #05 Y:2011 Use / purchase optimum sized compressor $8,856 $28,000
LE0332 #04 Y:2011 Install occupancy sensors $9,659 $24,370
LE0332 #03 Y:2011 Improve air circulation with destratification fans / other methods $12,677 $25,375
LE0332 #02 Y:2011 Minimize use of outside make-up air for ventilation except when used for economizer cycle $16,976 $7,660
LE0332 #01 Y:2011 Use solar heat to make electricty $66,813 -
LE0283 #24 Y:2008 Install occupancy sensors $550 $600
LE0283 #23 Y:2008 Utilize higher efficiency lamps and/or ballasts $7,799 $32,466
LE0283 #22 Y:2008 Reduce the pressure of compressed air to the minimum required $312 $240
LE0283 #21 Y:2008 Repair faulty insulation in furnaces, boilers, etc $608 $565
LE0283 #20 Y:2008 Minimize use of outside make-up air for ventilation except when used for economizer cycle $718 $300
LE0283 #19 Y:2008 Substitute hot process fluids for steam $1,040 $600
LE0283 #18 Y:2008 Install / repair insulation on steam lines $1,121 $1,000
LE0283 #17 Y:2008 Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,129 $600
LE0283 #16 Y:2008 Install compressor air intakes in coolest locations $5,319 $800
LE0283 #15 Y:2008 Utilize energy-efficient belts and other improved mechanisms $6,465 $160