16
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Mineral wool manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0027 #09 Y:2013 | 09 | 2013 | Automate finishing process | $53,406 | $11,000 | |
| WM0027 #08 Y:2013 | 08 | 2013 | Utilize controls to operate equipment only when needed | $11,010 | $7,260 | |
| WM0027 #07 Y:2013 | 07 | 2013 | Modify workload | $53,406 | - | |
| WM0027 #06 Y:2013 | 06 | 2013 | Increase amount of waste recovered for resale | $344 | $1,545 | |
| WM0027 #05 Y:2013 | 05 | 2013 | Add area lighting switches | $191 | $400 | |
| WM0027 #04 Y:2013 | 04 | 2013 | Analyze flue gas for proper air/fuel ratio | $8,126 | $1,240 | |
| WM0027 #03 Y:2013 | 03 | 2013 | Upgrade controls on compressors | $8,153 | $5,600 | |
| WM0027 #02 Y:2013 | 02 | 2013 | Install compressor air intakes in coolest locations | $1,649 | $276 | |
| WM0027 #01 Y:2013 | 01 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,697 | $644 | |
| WI0483 #07 Y:2004 | 07 | 2004 | Insulate bare equipment | $393 | $40 | |
| WI0483 #06 Y:2004 | 06 | 2004 | Reduce the pressure of compressed air to the minimum required | $1,886 | - | |
| WI0483 #05 Y:2004 | 05 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $2,971 | $2,186 | |
| WI0483 #04 Y:2004 | 04 | 2004 | Eliminate or reduce compressed air usage | $6,164 | $830 | |
| WI0483 #03 Y:2004 | 03 | 2004 | Analyze flue gas for proper air/fuel ratio | $3,804 | $500 | |
| WI0483 #02 Y:2004 | 02 | 2004 | Use waste heat from hot flue gases to preheat | $7,950 | $10,000 | |
| WI0483 #01 Y:2004 | 01 | 2004 | Utilize higher efficiency lamps and/or ballasts | $10,449 | $18,810 | n/a |