11
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0609 #06 Y:2017 | 06 | 2017 | Develop a repair/replace policy | $1,705 | $5,685 | |
| NC0609 #05 Y:2017 | 05 | 2017 | Reduce the pressure of compressed air to the minimum required | $1,341 | $2,500 | |
| NC0609 #04 Y:2017 | 04 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $650 | $200 | |
| NC0609 #03 Y:2017 | 03 | 2017 | Install occupancy sensors | $173 | $350 | |
| NC0609 #02 Y:2017 | 02 | 2017 | Utilize higher efficiency lamps and/or ballasts | $1,593 | $8,972 | |
| NC0609 #01 Y:2017 | 01 | 2017 | Replace high resistance ducts, pipes, and fittings | $9,405 | - | |
| NC0393 #05 Y:2009 | 05 | 2009 | Utilize higher efficiency lamps and/or ballasts | $967 | $2,795 | |
| NC0393 #04 Y:2009 | 04 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $256 | $100 | |
| NC0393 #03 Y:2009 | 03 | 2009 | Recycle air for heating, ventilation and air conditioning | $6,020 | $2,216 | |
| NC0393 #02 Y:2009 | 02 | 2009 | Reschedule plant operations or reduce load to avoid peaks | $31,650 | $1,000 | |
| NC0393 #01 Y:2009 | 01 | 2009 | Utilize a less expensive cooling method | $32,824 | $74,000 |