Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

373

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Glass product manufacturing made of purchased glass
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0647 #11 Y:2023 Insulate bare equipment $1,681 $195
WV0647 #10 Y:2023 Reduce ventilation air $2,625 $5,002
WV0647 #09 Y:2023 Change product design to reduce energy requirements $2,777 $9,380
WV0647 #08 Y:2023 Reduce the pressure of compressed air to the minimum required $3,315 $114
WV0647 #07 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,516 $864
WV0647 #06 Y:2023 Upgrade controls on compressors $3,789 $6,450
WV0647 #05 Y:2023 Reduce temperature of process equipment when on standby $4,595 $9,440
WV0647 #04 Y:2023 Eliminate or reduce compressed air usage $7,411 $1,508
WV0647 #03 Y:2023 Minimize water usage $7,590 $11,644
WV0647 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $8,420 $19,102
WV0647 #01 Y:2023 Use or replace with energy efficient substitutes $82,721 $146,400
IP0174 #06 Y:2023 Replace existing hvac unit with high efficiency model $28,594 $78,000
IP0174 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $80,518 $123,235
IP0174 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $12,006 $2,730
IP0174 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $76,877 $14,812
IP0174 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $19,401 $1,048
IP0174 #01 Y:2023 Turn off equipment when not in use $42,275 -
SJ0003 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $960 $2,889
SJ0003 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $326 $20
SJ0003 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,596 $5,020