21
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0337 #14 Y:2006 | 14 | 2006 | Make a practice of turning off lights when not needed | $1,138 | $200 | |
| NC0337 #13 Y:2006 | 13 | 2006 | Add area lighting switches | $524 | $1,200 | |
| NC0337 #12 Y:2006 | 12 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,986 | $50 | |
| NC0337 #11 Y:2006 | 11 | 2006 | Utilize higher efficiency lamps and/or ballasts | $3,266 | $3,139 | |
| NC0337 #10 Y:2006 | 10 | 2006 | Install / repair insulation on steam lines | $846 | $700 | |
| NC0337 #09 Y:2006 | 09 | 2006 | Reschedule plant operations or reduce load to avoid peaks | $2,941 | - | |
| NC0337 #08 Y:2006 | 08 | 2006 | Recover heat from exhausted steam, hot air or hot water | $16,069 | $19,441 | |
| NC0337 #07 Y:2006 | 07 | 2006 | Recover heat from exhausted steam, hot air or hot water | $23,249 | $11,746 | |
| NC0337 #06 Y:2006 | 06 | 2006 | Analyze flue gas for proper air/fuel ratio | $2,350 | $3,430 | |
| NC0337 #05 Y:2006 | 05 | 2006 | Re-arrange equipment layout to reduce handling costs | $10,650 | $5,000 | |
| NC0337 #04 Y:2006 | 04 | 2006 | Eliminate or reduce compressed air usage | $723 | $723 | |
| NC0337 #03 Y:2006 | 03 | 2006 | Recover waste heat from equipment | $9,180 | $18,000 | |
| NC0337 #02 Y:2006 | 02 | 2006 | Use / purchase optimum sized compressor | $13,276 | $18,000 | |
| NC0337 #01 Y:2006 | 01 | 2006 | Reduce ventilation air | $92,067 | $50,000 | |
| NC0335 #07 Y:2006 | 07 | 2006 | Install sensors to detect defects | $1,400 | $1,000 | |
| NC0335 #06 Y:2006 | 06 | 2006 | Install / repair insulation on steam lines | $67 | $147 | |
| NC0335 #05 Y:2006 | 05 | 2006 | Make a practice of turning off lights when not needed | $398 | $100 | |
| NC0335 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $752 | $500 | |
| NC0335 #03 Y:2006 | 03 | 2006 | Develop a repair/replace policy | $244 | $248 | |
| NC0335 #02 Y:2006 | 02 | 2006 | Recover waste heat from equipment | $21,192 | $1,000 |