ITAC Assessment: NC0335
ITAC logo
ITAC Assessment: NC0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Mirrors
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 176,000
ft2
Annual Production 10,000
thousand feet
Production Hrs. Annual 1,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,258 1,518,000
kWh
Electricity Demand $95,607 9,992
kW-mo/yr
Electricity Fees $1,536 -
Natural Gas $50,944 4,839
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 4.131: Modify process to reduce material use/cost $20,000 $4,500 - - - - $20,000
02 2.2437: Recover waste heat from equipment $21,192 $1,000 - - $21,192
-
MMBtu
- -
03 2.4151: Develop a repair/replace policy $244 $248 $57
2,160
kWh
$187
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $752 $500 $212
7,997
kWh
$540
-
kW-mo/yr
- - -
05 2.7124: Make a practice of turning off lights when not needed $398 $100 $398
14,998
kWh
- - - -
06 2.2136: Install / repair insulation on steam lines $67 $147 - - $67
-
MMBtu
- -
07 4.126: Install sensors to detect defects $1,400 $1,000 - - - $200 $1,200
TOTAL RECOMMENDED $44,053 $7,495 $667
25,155
kWh
$727
-
kW-mo/yr
$21,259
-
MMBtu
$200 $21,200
TOTAL IMPLEMENTED $2,861 $1,995 $667
25,155
kWh
$727
-
kW-mo/yr
$67
-
MMBtu
$200 $1,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs