| Assessment Year | 2011 |
|---|---|
| Principal Product | Piston/Gear pump components |
| NAICS | 333996: Fluid Power Pump and Motor Manufacturing |
| SIC | 3594: Fluid Power Pumps and Motors |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
341,000
ft2
|
| Annual Production | 5,255,500
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $772,809 | 10,228,800 |
kWh
|
$0.076 |
| Natural Gas | $237,831 | 44,076 |
MMBtu
|
$5.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $109,512 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,563 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6231: Utilize controls to operate equipment only when needed | $57,281 | $13,000 |
$57,281
716,012
kWh
|
- | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $12,351 | - |
$12,351
154,390
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,341 | $930 |
$7,341
91,760
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $340 | $950 |
$340
4,256
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $2,608 | $2,198 |
$2,608
32,597
kWh
|
- | |
| 06 | 2.7122: Disconnect ballasts | $849 | $696 |
$849
10,608
kWh
|
- | |
| 07 | 3.1191: Change procedures / equipment / operating conditions | $15,876 | $3,096 | - |
$15,876
-
MMBtu
|
|
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $9,335 | $20,544 | - |
$9,335
-
MMBtu
|
|
| 09 | 2.2511: Insulate bare equipment | $3,531 | $633 | - |
$3,531
-
MMBtu
|
|
| TOTAL RECOMMENDED | $109,512 | $42,047 |
$80,770
1,009,623
kWh
|
$28,742
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,563 | $2,513 |
$20,032
250,406
kWh
|
$3,531
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs