Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Clay building material and refractories manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0909 #12 Y:2014 Use waste heat from hot flue gases to preheat $5,987 $17,000
UD0909 #11 Y:2014 Install motor voltage controller on lightly loaded motors $7,664 $8,319
UD0909 #10 Y:2014 Reduce the pressure of compressed air to the minimum required $797 -
UD0909 #09 Y:2014 Reduce the pressure of compressed air to the minimum required $797 -
UD0909 #08 Y:2014 Install compressor air intakes in coolest locations $1,327 $3,000
UD0909 #07 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $3,032 $1,000
UD0909 #06 Y:2014 Meter recycled water (to reduce sewer charges) $11,214 $5,000
UD0909 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $667 $2,940
UD0909 #04 Y:2014 Install spectral reflectors / delamp $759 $500
UD0909 #03 Y:2014 Install occupancy sensors $16,710 $4,000
UD0909 #02 Y:2014 Utilize daylight whenever possible in lieu of artificial light $1,680 $1,125
UD0909 #01 Y:2014 Reduce space conditioning during non-working hours $20,106 $510
UD0825 #10 Y:2010 Recover waste heat from equipment $5,151 $1,200
UD0825 #09 Y:2010 Use waste heat from hot flue gases to preheat $11,851 $13,500
UD0825 #08 Y:2010 Install compressor air intakes in coolest locations $214 $60
UD0825 #07 Y:2010 Install occupancy sensors $268 $75
UD0825 #06 Y:2010 Avoid rewinding motors more than twice $783 $971
UD0825 #05 Y:2010 Utilize energy-efficient belts and other improved mechanisms $1,681 $25
UD0825 #04 Y:2010 Turn off equipment during breaks, reduce operating time $2,525 $100
UD0825 #03 Y:2010 Use optimum size and capacity equipment $2,869 $10,000