Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pottery, ceramics, and plumbing fixture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0616 #04 Y:2024 Use solar heat to make electricty $61,055 $261,561
SF0616 #03 Y:2024 Recharge batteries on during off-peak demand periods $551 $550
SF0616 #02 Y:2024 Eliminate or reduce compressed air usage $292 $292
SF0616 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,331 $1,971
SF0313 #11 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $2,515 $13,681
SF0313 #10 Y:2005 Use photocell controls $3,196 $7,650
SF0313 #09 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $4,672 $8,006
SF0313 #08 Y:2005 Replace electrically-operated equipment with fossil fuel equipment $3,051 $3,441
SF0313 #07 Y:2005 Install occupancy sensors $7,324 $9,540
SF0313 #06 Y:2005 Utilize higher efficiency lamps and/or ballasts $22,274 $27,658
SF0313 #05 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $959 $515
SF0313 #04 Y:2005 Eliminate or reduce compressed air usage $4,078 $1,561
SF0313 #03 Y:2005 Use photocell controls $3,023 $714
SF0313 #02 Y:2005 Change operating conditions $1,859 -
SF0313 #01 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $11,370 $396
SF0277 #16 Y:2003 Optimize plant power factor $3,454 $5,667
SF0277 #15 Y:2003 Change operating conditions $5,549 -
SF0277 #14 Y:2003 Consider use / purchase of bulk materials where possible $7,239 -
SF0277 #13 Y:2003 Install equipment (eg compactor) to reduce disposal costs $5,568 $18,000
SF0277 #12 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $7,600 $32,344