136
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0332 #09 Y:2025 | 09 | 2025 | Upgrade controls on compressors | $1,012 | $5,000 |
n/a
|
| TT0332 #08 Y:2025 | 08 | 2025 | Initiate a program to acquire iso certification | $3,379 | $15,000 |
n/a
|
| TT0332 #07 Y:2025 | 07 | 2025 | Recover waste heat from equipment | $867 | $3,000 |
n/a
|
| TT0332 #06 Y:2025 | 06 | 2025 | Turn off equipment when not in use | $206 | $200 |
n/a
|
| TT0332 #05 Y:2025 | 05 | 2025 | Eliminate or reduce compressed air usage | $2,283 | $1,000 |
n/a
|
| TT0332 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,645 | $1,825 |
n/a
|
| TT0332 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,989 | $960 |
n/a
|
| TT0332 #02 Y:2025 | 02 | 2025 | Turn off equipment when not in use | $1,541 | $120 |
n/a
|
| TT0332 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $726 | $30 |
n/a
|
| TT0316 #11 Y:2024 | 11 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,763 | $1,345 | |
| TT0316 #10 Y:2024 | 10 | 2024 | Recover waste heat from equipment | $5,587 | $1,500 | |
| TT0316 #09 Y:2024 | 09 | 2024 | Reduce the pressure of compressed air to the minimum required | $7,504 | $60 | |
| TT0316 #08 Y:2024 | 08 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $10,806 | $12,000 | |
| TT0316 #07 Y:2024 | 07 | 2024 | Turn off equipment when not in use | $11,283 | $30 | |
| TT0316 #06 Y:2024 | 06 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $17,400 | $10,380 | |
| TT0316 #05 Y:2024 | 05 | 2024 | Close outdoor air dampers during warm-up / cool-down periods | $18,330 | $3,200 | |
| TT0316 #04 Y:2024 | 04 | 2024 | Meter waste water | $22,342 | $10,000 | |
| TT0316 #03 Y:2024 | 03 | 2024 | Change rate schedules or other changes in utility service | $147,843 | $200,000 | |
| TT0316 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $259,778 | $1,375,785 | |
| TT0316 #01 Y:2024 | 01 | 2024 | Change rate schedules or other changes in utility service | $1,156,718 | $75,000 |