Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

136

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0332 #09 Y:2025 Upgrade controls on compressors $1,012 $5,000
TT0332 #08 Y:2025 Initiate a program to acquire iso certification $3,379 $15,000
TT0332 #07 Y:2025 Recover waste heat from equipment $867 $3,000
TT0332 #06 Y:2025 Turn off equipment when not in use $206 $200
TT0332 #05 Y:2025 Eliminate or reduce compressed air usage $2,283 $1,000
TT0332 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,645 $1,825
TT0332 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,989 $960
TT0332 #02 Y:2025 Turn off equipment when not in use $1,541 $120
TT0332 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $726 $30
TT0316 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,763 $1,345
TT0316 #10 Y:2024 Recover waste heat from equipment $5,587 $1,500
TT0316 #09 Y:2024 Reduce the pressure of compressed air to the minimum required $7,504 $60
TT0316 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,806 $12,000
TT0316 #07 Y:2024 Turn off equipment when not in use $11,283 $30
TT0316 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $17,400 $10,380
TT0316 #05 Y:2024 Close outdoor air dampers during warm-up / cool-down periods $18,330 $3,200
TT0316 #04 Y:2024 Meter waste water $22,342 $10,000
TT0316 #03 Y:2024 Change rate schedules or other changes in utility service $147,843 $200,000
TT0316 #02 Y:2024 Use solar heat to make electricty $259,778 $1,375,785
TT0316 #01 Y:2024 Change rate schedules or other changes in utility service $1,156,718 $75,000