1,027
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0456 #04 Y:2012 | 04 | 2012 | Use photocell controls | $5,372 | $4,900 | |
| SD0456 #03 Y:2012 | 03 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $7,264 | $10,398 | |
| SD0456 #02 Y:2012 | 02 | 2012 | Eliminate or reduce compressed air usage | $8,534 | $2,700 | |
| SD0456 #01 Y:2012 | 01 | 2012 | Replace electrically-operated equipment with fossil fuel equipment | $48,105 | $79,350 | |
| WV0455 #18 Y:2012 | 18 | 2012 | Analyze flue gas for proper air/fuel ratio | $377 | $500 | |
| WV0455 #17 Y:2012 | 17 | 2012 | Use photocell controls | $645 | $620 | |
| WV0455 #16 Y:2012 | 16 | 2012 | Utilize higher efficiency lamps and/or ballasts | $712 | $620 | |
| WV0455 #15 Y:2012 | 15 | 2012 | Reduce the pressure of compressed air to the minimum required | $845 | $70 | |
| WV0455 #14 Y:2012 | 14 | 2012 | Use waste heat from hot flue gases to preheat | $1,149 | $4,320 | |
| WV0455 #13 Y:2012 | 13 | 2012 | Develop a repair/replace policy | $1,157 | $841 | |
| WV0455 #12 Y:2012 | 12 | 2012 | Utilize energy-efficient belts and other improved mechanisms | $1,418 | $1,000 | |
| WV0455 #11 Y:2012 | 11 | 2012 | Establish a predictive maintenance program | $1,644 | $1,000 | |
| WV0455 #10 Y:2012 | 10 | 2012 | Eliminate or reduce compressed air usage | $1,663 | $2,117 | |
| WV0455 #09 Y:2012 | 09 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,863 | $1,706 | |
| WV0455 #08 Y:2012 | 08 | 2012 | Replace obsolete burners with more efficient ones | $1,918 | $4,850 | |
| WV0455 #07 Y:2012 | 07 | 2012 | Recover waste heat from equipment | $2,374 | $4,330 | |
| WV0455 #06 Y:2012 | 06 | 2012 | Utilize higher efficiency lamps and/or ballasts | $2,600 | $3,294 | |
| WV0455 #05 Y:2012 | 05 | 2012 | Upgrade controls on compressors | $3,160 | $5,680 | |
| WV0455 #04 Y:2012 | 04 | 2012 | Insulate bare equipment | $6,023 | $2,440 | |
| WV0455 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $6,439 | $5,745 |