Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

962

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0113 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $374 $500
NL0113 #07 Y:2025 Install occupancy sensors $2,902 $772
NL0113 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,978 $3,292
NL0113 #05 Y:2025 Apply for tax-free status for energy purchases $5,520 $400
NL0113 #04 Y:2025 Meter recycled water (to reduce sewer charges) $43,590 $52,034
NL0113 #03 Y:2025 Eliminate leaks in water lines and valves $58,063 $520
NL0113 #02 Y:2025 Use or replace with energy efficient substitutes $542,223 $1,261,250
NL0113 #01 Y:2025 Use or replace with energy efficient substitutes $1,107,096 $3,374,250
LE0599 #12 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,690 $12,500
LE0599 #11 Y:2025 Replace existing hvac unit with high efficiency model $32,291 $137,607
LE0599 #10 Y:2025 Use solar heat to make electricty $39,348 $166,600
LE0599 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $8,397 $22,164
LE0599 #08 Y:2025 Install compressor air intakes in coolest locations $808 $1,500
LE0599 #07 Y:2025 Burn a less expensive grade of fuel $2,581 $4,000
LE0599 #06 Y:2025 Use closed cycle process to minimize waste water production $98,974 $65,000
LE0599 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,274 $2,000
LE0599 #04 Y:2025 Upgrade obsolete equipment $66,584 $25,000
LE0599 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $24,855 $7,000
LE0599 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $3,295 $100
LE0599 #01 Y:2025 Change rate schedules or other changes in utility service $15,231 $50