| TT0317 #16 Y:2024 | 16 | 2024 | Upgrade obsolete equipment | $4,116 | $50,000 | |
| TT0317 #15 Y:2024 | 15 | 2024 | Eliminate or reduce compressed air usage | $8,295 | $40,000 | |
| TT0317 #14 Y:2024 | 14 | 2024 | Utilize higher efficiency lamps and/or ballasts | $698 | $2,910 | |
| TT0317 #13 Y:2024 | 13 | 2024 | Adopt in-house material generation | $205,758 | $600,000 | |
| TT0317 #12 Y:2024 | 12 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $6,299 | $16,125 | |
| TT0317 #11 Y:2024 | 11 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $22,558 | $39,000 | |
| TT0317 #10 Y:2024 | 10 | 2024 | Minimize boiler blowdown with better feedwater treatment | $56,902 | $80,000 | |
| TT0317 #09 Y:2024 | 09 | 2024 | Upgrade controls on compressors | $6,847 | $8,500 | |
| TT0317 #08 Y:2024 | 08 | 2024 | Initiate a program to acquire iso certification | $64,353 | $60,000 | |
| TT0317 #07 Y:2024 | 07 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,968 | $2,475 | |
| TT0317 #06 Y:2024 | 06 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $169,411 | $120,000 | |
| TT0317 #05 Y:2024 | 05 | 2024 | Insulate bare equipment | $2,015 | $1,364 | |
| TT0317 #04 Y:2024 | 04 | 2024 | Use waste heat from hot flue gases to preheat | $19,788 | $13,300 | |
| TT0317 #03 Y:2024 | 03 | 2024 | Utilize controls to operate equipment only when needed | $859 | $400 | |
| TT0317 #02 Y:2024 | 02 | 2024 | Repair or replace steam traps | $79,406 | $13,250 | |
| TT0317 #01 Y:2024 | 01 | 2024 | Begin a practice of predictive / preventative maintenance | $374,993 | $42,000 | |
| TT0214 #07 Y:2018 | 07 | 2018 | Utilize higher efficiency lamps and/or ballasts | $5,443 | $15,674 | |
| TT0214 #06 Y:2018 | 06 | 2018 | Optimize plant power factor | $13,401 | $5,000 | |
| TT0214 #05 Y:2018 | 05 | 2018 | Size electric motors for peak operating efficiency | $23,715 | $75,000 | |
| TT0214 #04 Y:2018 | 04 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $24,330 | $66,000 |