Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Tire manufacturing (except retreading)
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0317 #16 Y:2024 Upgrade obsolete equipment $4,116 $50,000
TT0317 #15 Y:2024 Eliminate or reduce compressed air usage $8,295 $40,000
TT0317 #14 Y:2024 Utilize higher efficiency lamps and/or ballasts $698 $2,910
TT0317 #13 Y:2024 Adopt in-house material generation $205,758 $600,000
TT0317 #12 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $6,299 $16,125
TT0317 #11 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $22,558 $39,000
TT0317 #10 Y:2024 Minimize boiler blowdown with better feedwater treatment $56,902 $80,000
TT0317 #09 Y:2024 Upgrade controls on compressors $6,847 $8,500
TT0317 #08 Y:2024 Initiate a program to acquire iso certification $64,353 $60,000
TT0317 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,968 $2,475
TT0317 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $169,411 $120,000
TT0317 #05 Y:2024 Insulate bare equipment $2,015 $1,364
TT0317 #04 Y:2024 Use waste heat from hot flue gases to preheat $19,788 $13,300
TT0317 #03 Y:2024 Utilize controls to operate equipment only when needed $859 $400
TT0317 #02 Y:2024 Repair or replace steam traps $79,406 $13,250
TT0317 #01 Y:2024 Begin a practice of predictive / preventative maintenance $374,993 $42,000
TT0214 #07 Y:2018 Utilize higher efficiency lamps and/or ballasts $5,443 $15,674
TT0214 #06 Y:2018 Optimize plant power factor $13,401 $5,000
TT0214 #05 Y:2018 Size electric motors for peak operating efficiency $23,715 $75,000
TT0214 #04 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $24,330 $66,000