Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0863 #04 Y:2013 Insulate bare equipment $10,721 $1,250
OK0863 #03 Y:2013 Install occupancy sensors $3,208 $4,450
OK0863 #02 Y:2013 Use or replace with energy efficient substitutes $8,069 $22,428
OK0863 #01 Y:2013 Eliminate or reduce compressed air usage $14,703 $2,500
OK0825 #12 Y:2012 Recharge batteries on during off-peak demand periods $6,335 -
OK0825 #11 Y:2012 Insulate glazing, walls, ceilings, and roofs $8,292 $406,800
OK0825 #10 Y:2012 Install set-back timers $929 $937
OK0825 #09 Y:2012 Separate controls of air handlers from ac/ heating systems $15,683 $15,683
OK0825 #08 Y:2012 Shut off cooling if cold outside air will cool process $62,755 $31,500
OK0825 #07 Y:2012 Reduce the pressure of compressed air to the minimum required $2,300 $450
OK0825 #06 Y:2012 Install compressor air intakes in coolest locations $1,119 $538
OK0825 #05 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $12,478 $1,500
OK0825 #04 Y:2012 Use or replace with energy efficient substitutes $19,699 $65,000
OK0825 #03 Y:2012 Install occupancy sensors $194 $3,150
OK0825 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $7,541 $68,775
OK0825 #01 Y:2012 Replace boiler $228,516 $1,085,000
LL0334 #09 Y:2010 Utilize higher efficiency lamps and/or ballasts $38 $19
LL0334 #08 Y:2010 Conserve energy by efficient use of vending machines $664 $646
LL0334 #07 Y:2010 Reduce illumination to minimum necessary levels $603 $290
LL0334 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $522 $630