matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
KS2437 #09 Y:2024 | 09 | 2024 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $65,208 | $627,000 |
n/a
|
KS2437 #08 Y:2024 | 08 | 2024 | Install / repair insulation on steam lines | $1,546 | $4,072 |
n/a
|
KS2437 #07 Y:2024 | 07 | 2024 | Use most efficient type of electric motors | $8,975 | $88,610 |
n/a
|
KS2437 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $47,984 | $340,586 |
n/a
|
KS2437 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $18,870 | $69,278 |
n/a
|
KS2437 #04 Y:2024 | 04 | 2024 | Apply for tax-free status for energy purchases | $22,668 | $1,600 |
n/a
|
KS2437 #03 Y:2024 | 03 | 2024 | Recover heat from exhausted steam, hot air or hot water | $771 | $2,184 |
n/a
|
KS2437 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,218 | $60 |
n/a
|
KS2437 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,199 | $5,960 |
n/a
|
TT0325 #11 Y:2024 | 11 | 2024 | Use most efficient type of electric motors | $718 | $2,640 |
n/a
|
TT0325 #10 Y:2024 | 10 | 2024 | Meter waste water | $1,047 | $1,100 |
n/a
|
TT0325 #09 Y:2024 | 09 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $3,955 | $1,000 |
n/a
|
TT0325 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $4,068 | $15,000 |
n/a
|
TT0325 #07 Y:2024 | 07 | 2024 | Eliminate or reduce compressed air usage | $5,049 | $30,040 |
n/a
|
TT0325 #06 Y:2024 | 06 | 2024 | Turn off equipment when not in use | $5,854 | $400 |
n/a
|
TT0325 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $5,974 | $16,000 |
n/a
|
TT0325 #04 Y:2024 | 04 | 2024 | Use heat from boiler blowdown to preheat boiler feed water | $8,824 | $22,500 |
n/a
|
TT0325 #03 Y:2024 | 03 | 2024 | Preheat boiler makeup water with waste process heat | $30,978 | $17,480 |
n/a
|
TT0325 #02 Y:2024 | 02 | 2024 | Install smaller boiler (increase high fire duty cycle) | $68,822 | $200,000 |
n/a
|
TT0325 #01 Y:2024 | 01 | 2024 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $242,348 | $1,045,217 |