Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,388

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KS2437 #09 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $65,208 $627,000
KS2437 #08 Y:2024 Install / repair insulation on steam lines $1,546 $4,072
KS2437 #07 Y:2024 Use most efficient type of electric motors $8,975 $88,610
KS2437 #06 Y:2024 Use solar heat to make electricty $47,984 $340,586
KS2437 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $18,870 $69,278
KS2437 #04 Y:2024 Apply for tax-free status for energy purchases $22,668 $1,600
KS2437 #03 Y:2024 Recover heat from exhausted steam, hot air or hot water $771 $2,184
KS2437 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $1,218 $60
KS2437 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $7,199 $5,960
TT0325 #11 Y:2024 Use most efficient type of electric motors $718 $2,640
TT0325 #10 Y:2024 Meter waste water $1,047 $1,100
TT0325 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,955 $1,000
TT0325 #08 Y:2024 Install occupancy sensors $4,068 $15,000
TT0325 #07 Y:2024 Eliminate or reduce compressed air usage $5,049 $30,040
TT0325 #06 Y:2024 Turn off equipment when not in use $5,854 $400
TT0325 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $5,974 $16,000
TT0325 #04 Y:2024 Use heat from boiler blowdown to preheat boiler feed water $8,824 $22,500
TT0325 #03 Y:2024 Preheat boiler makeup water with waste process heat $30,978 $17,480
TT0325 #02 Y:2024 Install smaller boiler (increase high fire duty cycle) $68,822 $200,000
TT0325 #01 Y:2024 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $242,348 $1,045,217