Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Urethane and other foam product (except polystyrene) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0608 #08 Y:2025 Use properly designed and sized hvac equipment $2,899 $19,500
LE0608 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $712 $3,905
LE0608 #06 Y:2025 Preheat combustion air with waste heat $1,620 $7,750
LE0608 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,119 $5,034
LE0608 #04 Y:2025 Install compressor air intakes in coolest locations $5,352 $4,000
LE0608 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $20,628 $2,200
LE0608 #02 Y:2025 Install timers and/or thermostats $9,619 -
LE0608 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $2,693 -
SJ0042 #09 Y:2025 Use solar heat to make electricty $254,444 $1,522,550
SJ0042 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,895 -
SJ0042 #07 Y:2025 Eliminate or reduce compressed air usage $1,004 -
SJ0042 #06 Y:2025 Eliminate or reduce compressed air usage $2,422 $1,167
SJ0042 #05 Y:2025 Install occupancy sensors $19,412 $41,750
SJ0042 #04 Y:2025 Reduce excessive boiler blowdown $1,078 $2,456
SJ0042 #03 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $258 $1,739
SJ0042 #02 Y:2025 Insulate bare equipment $462 $798
SJ0042 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $26,657 $43,400
MS0460 #06 Y:2025 Replace fossil fuel equipment with electrical equipment $65,736 $455,000
MS0460 #05 Y:2025 Upgrade obsolete equipment $3,803 $32,650
MS0460 #04 Y:2025 Upgrade obsolete equipment $46,155 $90,967