41
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Plastics pipe and pipe fitting manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0529 #06 Y:2016 | 06 | 2016 | Upgrade controls on compressors | $624 | $1,090 | |
| WV0529 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $651 | $1,922 | |
| WV0529 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $993 | $125 | |
| WV0529 #03 Y:2016 | 03 | 2016 | Reschedule plant operations or reduce load to avoid peaks | $1,056 | $1,000 | |
| WV0529 #02 Y:2016 | 02 | 2016 | Install compressor air intakes in coolest locations | $1,370 | $980 | |
| WV0529 #01 Y:2016 | 01 | 2016 | Insulate bare equipment | $3,852 | $1,833 | |
| UD0844 #15 Y:2011 | 15 | 2011 | Reduce ventilation air | $17,779 | - | |
| UD0844 #14 Y:2011 | 14 | 2011 | Lower temperature during the winter season and vice-versa | $18,762 | - | |
| UD0844 #13 Y:2011 | 13 | 2011 | Use optimum temperature | $3,225 | - | |
| UD0844 #12 Y:2011 | 12 | 2011 | Use waste heat from hot flue gases to preheat | $10,508 | $16,000 | |
| UD0844 #11 Y:2011 | 11 | 2011 | Analyze flue gas for proper air/fuel ratio | $13,123 | $1,000 | |
| UD0844 #10 Y:2011 | 10 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $267 | - | |
| UD0844 #09 Y:2011 | 09 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,616 | $500 | |
| UD0844 #08 Y:2011 | 08 | 2011 | Install compressor air intakes in coolest locations | $3,988 | $5,000 | |
| UD0844 #07 Y:2011 | 07 | 2011 | Eliminate or reduce compressed air usage | $7,542 | - | |
| UD0844 #06 Y:2011 | 06 | 2011 | Upgrade controls on compressors | $20,051 | $18,555 | |
| UD0844 #05 Y:2011 | 05 | 2011 | Utilize energy-efficient belts and other improved mechanisms | $2,557 | - | |
| UD0844 #04 Y:2011 | 04 | 2011 | Turn off equipment when not in use | $33,247 | $2,000 | |
| UD0844 #03 Y:2011 | 03 | 2011 | Optimize plant power factor | $11,543 | $16,000 | |
| UD0844 #02 Y:2011 | 02 | 2011 | Use reactive rinsing | $70,989 | $30,000 |