Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Unlaminated plastics film and sheet (except packaging) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1054 #07 Y:2023 Disconnect ballasts $172 $240
UD1054 #06 Y:2023 Install occupancy sensors $1,142 $9,668
UD1054 #05 Y:2023 Close holes and openings in building such as broken windows $11,624 $1,500
UD1054 #04 Y:2023 Install compressor air intakes in coolest locations $242 $500
UD1054 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $310 -
UD1054 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,248 $500
UD1054 #01 Y:2023 Utilize energy-efficient belts and other improved mechanisms $74 -
UD1009 #07 Y:2019 Chill water to the highest temperature possible $73,844 $147,736
UD1009 #06 Y:2019 Replace existing chiller with high efficiency model $100,517 $151,300
UD1009 #05 Y:2019 Replace city water with recycled water via cooling tower $107,302 $83,000
UD1009 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $4,717 $4,388
UD1009 #03 Y:2019 Install outside air damper / economizer on hvac unit $78,282 $44,250
UD1009 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $7,826 $1,000
UD1009 #01 Y:2019 Turn off equipment during breaks, reduce operating time $32,116 -