Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous chemical product and preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0754 #08 Y:2015 Replace electric motor with fossil fuel engine $1,151 $500
MA0754 #07 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $6,913 $4,940
MA0754 #06 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $25,043 $13,895
MA0754 #05 Y:2015 Meter recycled water (to reduce sewer charges) $34,769 $3,000
MA0754 #04 Y:2015 Increase amount of condensate returned $62,104 $250,000
MA0754 #03 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $71,309 $500,000
MA0754 #02 Y:2015 Chill water to the highest temperature possible $112,215 $1,000
MA0754 #01 Y:2015 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $1,595,248 $5,445,000
NC0539 #08 Y:2015 Install occupancy sensors $53 $200
NC0539 #07 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $357 $100
NC0539 #06 Y:2015 Repair and eliminate steam leaks $1,216 $2,500
NC0539 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,189 $3,822
NC0539 #04 Y:2015 Change rate schedules or other changes in utility service $1,453 $500
NC0539 #03 Y:2015 Develop a repair/replace policy $2,085 $4,526
NC0539 #02 Y:2015 Keep boiler tubes clean $3,889 $2,000
NC0539 #01 Y:2015 Install / repair insulation on steam lines $6,900 $3,517