ITAC Assessment: NC0539
ITAC logo
ITAC Assessment: NC0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Reprocessed oil/glycol
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 10,000
ft2
Annual Production 1,000
Tgal
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,228 90,678
kWh
Electricity Demand $3,592 735
kW-mo/yr
Fuel Oil #4 $91,216 5,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2136: Install / repair insulation on steam lines $6,900 $3,517 - $6,900
-
MMBtu
- -
02 2.1232: Keep boiler tubes clean $3,889 $2,000 - $3,889
-
MMBtu
- -
03 2.4151: Develop a repair/replace policy $2,085 $4,526 $2,085
30,221
kWh
- - -
04 2.8114: Change rate schedules or other changes in utility service $1,453 $500 $1,453
-
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,189 $3,822 $1,139
16,506
kWh
- - $50
06 2.2135: Repair and eliminate steam leaks $1,216 $2,500 - $1,216
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $357 $100 $517
7,487
kWh
- $(-100.0) $(-60.0)
08 2.7135: Install occupancy sensors $53 $200 $53
770
kWh
- - -
TOTAL RECOMMENDED $17,142 $17,165 $5,247
54,984
kWh
$12,005
-
MMBtu
$(-100.0) $(-10.0)
TOTAL IMPLEMENTED $14,447 $12,643 $2,602
37,708
kWh
$12,005
-
MMBtu
$(-100.0) $(-60.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs