Assessment Year | 2015 |
---|---|
Principal Product | Reprocessed oil/glycol |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 23 |
Plant Area |
10,000
ft2
|
Annual Production | 1,000
Tgal
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $6,228 | 90,678 |
kWh
|
$0.069 |
Electricity Demand | $3,592 | 735 |
kW-mo/yr
|
$4.89 |
Fuel Oil #4 | $91,216 | 5,676 |
MMBtu
|
$16.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,447 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $6,900 | $3,517 | - |
$6,900
-
MMBtu
|
- | - | |
02 | 2.1232: Keep boiler tubes clean | $3,889 | $2,000 | - |
$3,889
-
MMBtu
|
- | - | |
03 | 2.4151: Develop a repair/replace policy | $2,085 | $4,526 |
$2,085
30,221
kWh
|
- | - | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $1,453 | $500 |
$1,453
-
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,189 | $3,822 |
$1,139
16,506
kWh
|
- | - | $50 | |
06 | 2.2135: Repair and eliminate steam leaks | $1,216 | $2,500 | - |
$1,216
-
MMBtu
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $357 | $100 |
$517
7,487
kWh
|
- | $(-100.0) | $(-60.0) | |
08 | 2.7135: Install occupancy sensors | $53 | $200 |
$53
770
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $17,142 | $17,165 |
$5,247
54,984
kWh
|
$12,005
-
MMBtu
|
$(-100.0) | $(-10.0) | ||
TOTAL IMPLEMENTED | $14,447 | $12,643 |
$2,602
37,708
kWh
|
$12,005
-
MMBtu
|
$(-100.0) | $(-60.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs