Assessment Year | 2021 |
---|---|
Principal Product | Fabric Cutting Machines |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 122 |
Plant Area |
130,000
ft2
|
Annual Production | 400
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,244 | 890,123 |
kWh
|
$0.046 |
Electricity Demand | $27,864 | 2,841 |
kW-mo/yr
|
$9.81 |
Electricity Fees | $6,498 | - |
|
- |
Natural Gas | $16,338 | 2,360 |
MMBtu
|
$6.92 |
TOTAL YEARLY COSTS | $91,944 | |||
RECOMMENDED SAVINGS* | $3,109 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $97 | - |
$97
2,117
kWh
|
- | - | - | - | |
02 | 3.1161: Eliminate/reduce an operation | $515 | $50 |
$411
8,925
kWh
|
$368
-
kW-mo/yr
|
$(-263.4)
-
MMBtu
|
- | - | |
03 | 2.7314: Reduce ventilation air | $1,725 | $882 |
$462
10,037
kWh
|
- |
$1,263
-
MMBtu
|
- | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $421 | $569 |
$119
2,584
kWh
|
$35
-
kW-mo/yr
|
- | $172 | $95 | |
05 | 2.4322: Use or replace with energy efficient substitutes | $211 | $371 |
$95
2,069
kWh
|
$110
-
kW-mo/yr
|
- | - | $6 | |
06 | 2.7135: Install occupancy sensors | $139 | $601 |
$139
3,023
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $3,109 | $2,473 |
$1,323
28,755
kWh
|
$513
-
kW-mo/yr
|
$1,000
-
MMBtu
|
$172 | $101 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs