ITAC Assessment: MA0754
ITAC logo
ITAC Assessment: MA0754
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Chemicals for personal care industry
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 61
Plant Area 163,000
ft2
Annual Production 7,900
ton
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,383,404 17,634,750
kWh
Electricity Demand $99,138 30,785
kW-mo/yr
Electricity Fees $(-77.0) -
Natural Gas $1,397,304 163,046
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,908,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $1,595,248 $5,445,000 $2,103,177
15,579,089
kWh
$342,740 $(-539,087.0)
-
MMBtu
- $(-311,582.0) -
02 2.2625: Chill water to the highest temperature possible $112,215 $1,000 $112,215
831,223
kWh
- - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $71,309 $500,000 $71,309
528,214
kWh
- - - - -
04 2.2121: Increase amount of condensate returned $62,104 $250,000 - - $33,337
-
MMBtu
$20,329
-
Tgal
- $8,438
-
Tgal
05 3.4116: Meter recycled water (to reduce sewer charges) $34,769 $3,000 - - - $34,769
-
Tgal
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,043 $13,895 $25,043
185,507
kWh
- - - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,913 $4,940 $6,913
51,208
kWh
- - - - -
08 2.4134: Replace electric motor with fossil fuel engine $1,151 $500 $1,151
8,528
kWh
- - - - -
TOTAL RECOMMENDED $1,908,752 $6,218,335 $2,319,808
17,183,769
kWh
$342,740 $(-505,750.0)
-
MMBtu
$55,098
-
Tgal
$(-311,582.0) $8,438
-
Tgal
TOTAL IMPLEMENTED $66,725 $21,835 $31,956
236,715
kWh
- - $34,769
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs