Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Toilet preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2316 #06 Y:2023 Install hydrogen fuel cell $281,388 $1,750,000
UL2316 #05 Y:2023 Improve air circulation with destratification fans / other methods $15,036 $20,000
UL2316 #04 Y:2023 Reduce space conditioning during non-working hours $7,026 -
UL2316 #03 Y:2023 Use solar heat to make electricty $112,167 $989,084
UL2316 #02 Y:2023 Use outside cold water source as a supply of cooling water $73,247 $137,300
UL2316 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $14,992 -
UK1603 #10 Y:2016 Reduce combustion air flow to optimum $2,457 -
UK1603 #09 Y:2016 Preheat combustion air with waste heat $33,165 $58,682
UK1603 #08 Y:2016 Recover heat from exhausted steam, hot air or hot water $33,264 $30,000
UK1603 #07 Y:2016 Reduce space conditioning during non-working hours $16,948 -
UK1603 #06 Y:2016 Install compressor air intakes in coolest locations $1,304 $1,600
UK1603 #05 Y:2016 Reduce the pressure of compressed air to the minimum required $3,058 -
UK1603 #04 Y:2016 Use or replace with energy efficient substitutes $9,160 $14,700
UK1603 #03 Y:2016 Use or replace with energy efficient substitutes $18,272 $35,000
UK1603 #02 Y:2016 Utilize daylight whenever possible in lieu of artificial light $3,306 $1,445
UK1603 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $89,730 $85,358