ITAC Assessment: UK1603
ITAC logo
ITAC Assessment: UK1603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Shampoos and Conditioners
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $100
M
to 500
M
# of Employees 341
Plant Area 304,000
ft2
Annual Production 183,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $503,809 11,144,781
kWh
Electricity Demand $300,211 22,472
kW-mo/yr
Electricity Fees $1,748 -
Natural Gas $292,361 44,492
MMBtu
Waste Disposal Costs
Water Usage $186,361 35,980,174
Tgal
TOTAL YEARLY COSTS $1,284,490
RECOMMENDED SAVINGS* $210,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $171,036

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $89,730 $85,358 $55,841
1,235,238
kWh
$24,729
-
kW-mo/yr
- $9,160
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,306 $1,445 $3,306
73,140
kWh
- - -
03 2.4322: Use or replace with energy efficient substitutes $18,272 $35,000 $6,729
148,870
kWh
$11,543
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $9,160 $14,700 $1,785
39,500
kWh
$7,375
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,058 - $3,058
67,663
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,304 $1,600 $1,304
28,859
kWh
- - -
07 2.7224: Reduce space conditioning during non-working hours $16,948 - $8,182
181,008
kWh
$2,886
-
kW-mo/yr
$5,880
-
MMBtu
-
08 2.2449: Recover heat from exhausted steam, hot air or hot water $33,264 $30,000 - - $33,264
-
MMBtu
-
09 2.2442: Preheat combustion air with waste heat $33,165 $58,682 - - $33,165
-
MMBtu
-
10 2.1113: Reduce combustion air flow to optimum $2,457 - - - $2,457
-
MMBtu
-
TOTAL RECOMMENDED $210,664 $226,785 $80,205
1,774,278
kWh
$46,533
-
kW-mo/yr
$74,766
-
MMBtu
$9,160
TOTAL IMPLEMENTED $171,036 $195,340 $73,841
1,633,475
kWh
$46,533
-
kW-mo/yr
$41,502
-
MMBtu
$9,160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings