ITAC Assessment: MS0264
ITAC logo
ITAC Assessment: MS0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Recliner Mechanisms
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 350
Plant Area 195,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,578 4,737,893
kWh
Electricity Demand $95,587 10,855
kW-mo/yr
Electricity Fees $9,159 -
Natural Gas $443,114 66,692
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,471 $84,783 $11,300
314,872
kWh
$5,912
-
kW-mo/yr
$259 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,737 $318 $5,653
159,283
kWh
- $84 -
03 2.7229: Air condition only space necessary $2,457 $480 $462
13,029
kWh
$1,958
-
kW-mo/yr
$37 -
04 2.2437: Recover waste heat from equipment $1,356 $1,624 - - - $1,356
-
MMBtu
05 2.7261: Install timers and/or thermostats $989 $944 $974
27,452
kWh
- $15 -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $183 $249 $117
3,293
kWh
$63
-
kW-mo/yr
$3 -
TOTAL RECOMMENDED $28,193 $88,398 $18,506
517,929
kWh
$7,933
-
kW-mo/yr
$398 $1,356
-
MMBtu
TOTAL IMPLEMENTED $23,208 $85,101 $16,953
474,155
kWh
$5,912
-
kW-mo/yr
$343 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs