Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Soap and other detergent manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0279 #07 Y:2019 Install spectral reflectors / delamp $19,835 $25,600
MZ0279 #06 Y:2019 Insulate bare equipment $428 $1,464
MZ0279 #05 Y:2019 Recover waste heat from equipment $16,719 $14,400
MZ0279 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $27,794 $6,252
MZ0279 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $4,014 $640
MZ0279 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $78,987 $1,980
MZ0279 #01 Y:2019 Install compressor air intakes in coolest locations $3,031 $4,700
MI0328 #11 Y:2017 Insulate bare equipment $1,011 $206
MI0328 #10 Y:2017 Use photocell controls $1,016 $2,773
MI0328 #09 Y:2017 Eliminate or reduce compressed air usage $1,121 $1,501
MI0328 #08 Y:2017 Use photocell controls $2,086 $5,544
MI0328 #07 Y:2017 Utilize daylight whenever possible in lieu of artificial light $3,824 $5,032
MI0328 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $4,307 $13,190
MI0328 #05 Y:2017 Lower temperature during the winter season and vice-versa $5,680 $40
MI0328 #04 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $11,135 $1,660
MI0328 #03 Y:2017 Install partitions to reduce size of conditioned space $19,041 $25,680
MI0328 #02 Y:2017 Clean or color roof to reduce solar load $22,847 $63,840
MI0328 #01 Y:2017 Utilize a less expensive cooling method $32,062 $127,500
LE0438 #09 Y:2017 Re-use or recycle hot or cold process exhaust air $9,816 $47,000
LE0438 #08 Y:2017 Re-use or recycle hot or cold process exhaust air $19,166 $53,000