Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

769

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pharmaceutical preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0623 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,720 $4,257
SF0623 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,599 $3,962
SF0623 #03 Y:2024 Utilize controls to operate equipment only when needed $2,887 $1,146
SF0623 #02 Y:2024 Reduce ventilation air $4,851 -
SF0623 #01 Y:2024 Turn off equipment when not in use $4,288 -
MI0445 #08 Y:2024 Install occupancy sensors $3,269 $2,860
MI0445 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,583 $5,793
MI0445 #06 Y:2024 Change rate schedules or other changes in utility service $19,584 $150
MI0445 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $32,574 $11,027
MI0445 #04 Y:2024 Optimize plant power factor $46,588 $99,444
MI0445 #03 Y:2024 Pay utility bills on time $80,165 -
MI0445 #02 Y:2024 Use most efficient type of electric motors $217,248 $42,472
MI0445 #01 Y:2024 Replace existing chiller with high efficiency model $427,475 $602,500
MI0443 #08 Y:2024 Install occupancy sensors $1,287 $501
MI0443 #07 Y:2024 Recharge batteries on during off-peak demand periods $3,482 $240
MI0443 #06 Y:2024 Use solar heat to heat water $4,071 $12,390
MI0443 #05 Y:2024 Clean or color roof to reduce solar load $6,571 $14,916
MI0443 #04 Y:2024 Replace obsolete burners with more efficient ones $7,616 $18,760
MI0443 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $8,706 $1,980
MI0443 #02 Y:2024 Replace existing chiller with high efficiency model $14,162 $54,938