Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0643 #05 Y:2019 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $77,463 $300,000
NC0643 #04 Y:2019 Recover waste heat from equipment $34,280 $75,000
NC0643 #03 Y:2019 Utilize a less expensive cooling method $13,881 $30,000
NC0643 #02 Y:2019 Install smaller boiler (increase high fire duty cycle) $9,495 $1,000
NC0643 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $59,445 $139,040
NC0438 #08 Y:2011 Install occupancy sensors $1,416 $2,112
NC0438 #07 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $2,224 $300
NC0438 #06 Y:2011 Develop a repair/replace policy $5,515 $5,548
NC0438 #05 Y:2011 Replace the chlorination stage with an oxygen or ozone stage $43,023 $92,800
NC0438 #04 Y:2011 Repair or replace steam traps $19,936 $5,500
NC0438 #03 Y:2011 Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $19,068 $32,000
NC0438 #02 Y:2011 Use heat from boiler blowdown to preheat boiler feed water $8,972 $7,800
NC0438 #01 Y:2011 Replace purchased steam with other energy source $62,448 $94,000