Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0472 #06 Y:2026 Turn off equipment when not in use $9,021 -
MS0472 #05 Y:2026 Install occupancy sensors $277 $1,946
MS0472 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $4,200 -
MS0472 #03 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $174 -
MS0472 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,104 $4,093
MS0472 #01 Y:2026 Moderate cooling tower outlet temperature $1,553 $248
WV0682 #15 Y:2025 Eliminate or reduce compressed air usage $1,069 $1,258
WV0682 #14 Y:2025 Eliminate or reduce compressed air usage $3,661 $900
WV0682 #13 Y:2025 Upgrade controls on compressors $4,273 $13,665
WV0682 #12 Y:2025 Install compressor air intakes in coolest locations $4,346 $11,060
WV0682 #11 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,702 $378
WV0682 #10 Y:2025 Develop a repair/replace policy $5,033 $8,967
WV0682 #09 Y:2025 Analyze flue gas for proper air/fuel ratio $6,955 $3,160
WV0682 #08 Y:2025 Replace obsolete burners with more efficient ones $7,131 $13,250
WV0682 #07 Y:2025 Chill water to the highest temperature possible $7,508 $5,220
WV0682 #06 Y:2025 Install occupancy sensors $13,054 $14,058
WV0682 #05 Y:2025 Insulate bare equipment $17,044 $488
WV0682 #04 Y:2025 Establish a predictive maintenance program $17,883 $6,000
WV0682 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $18,561 $12,599
WV0682 #02 Y:2025 Minimize water usage $71,374 $60,060