Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,053

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics material and resin manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0398 #07 Y:2026 Use waste heat from hot flue gases to preheat $5,416 $60,000
MZ0398 #06 Y:2026 Use solar heat to make electricty $70,342 $285,001
MZ0398 #05 Y:2026 Analyze flue gas for proper air/fuel ratio $6,340 $1,000
MZ0398 #04 Y:2026 Install occupancy sensors $1,099 $2,700
MZ0398 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,164 $2,299
MZ0398 #02 Y:2026 Maintain air filters by cleaning or replacement $722 $600
MZ0398 #01 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,194 -
LT8445 #06 Y:2026 Install occupancy sensors $5,585 $462
LT8445 #05 Y:2026 Use solar heat to make electricty $3,325 $45,179
LT8445 #04 Y:2026 Turn off equipment when not in use $1,818 $1,302
LT8445 #03 Y:2026 Modify facility to avoid excess maintenance costs $15,500 $3,029
LT8445 #02 Y:2026 Use photocell controls $15,602 $8,665
LT8445 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $18,570 $25,215
UD1130 #09 Y:2026 Install occupancy sensors $728 $393
UD1130 #08 Y:2026 Disconnect ballasts $901 $300
UD1130 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $996 $759
UD1130 #06 Y:2026 Reduce the pressure of compressed air to the minimum required $6,540 $5,408
UD1130 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,951 $953
UD1130 #04 Y:2026 Install motor voltage controller on lightly loaded motors $10,947 $3,607
UD1130 #03 Y:2026 Install / repair insulation on steam lines $1,912 $633