Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ethyl alcohol manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1093 #13 Y:2023 Make a new by-product $1,221,405 $1,600,000
OK1093 #12 Y:2023 Add equipment/ operators to reduce production bottleneck $150,722 $300,000
OK1093 #11 Y:2023 Change method of deionized water production $98,980 $367,077
OK1093 #10 Y:2023 Repair faulty insulation in furnaces, boilers, etc $31,034 $19,400
OK1093 #09 Y:2023 Repair faulty insulation in furnaces, boilers, etc $4,201 $632
OK1093 #08 Y:2023 Turn off equipment during breaks, reduce operating time $12,354 $1,420
OK1093 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $17,345 $8,534
OK1093 #06 Y:2023 Eliminate or reduce compressed air usage $1,010 -
OK1093 #05 Y:2023 Install compressor air intakes in coolest locations $1,087 $343
OK1093 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,723 $1,260
OK1093 #03 Y:2023 Use solar heat to make electricty $29,830 $374,400
OK1093 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $420 $900
OK1093 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $10,678 $10,052
UD1032 #08 Y:2021 Use waste heat from hot flue gases to preheat $351,582 $1,000,000
UD1032 #07 Y:2021 Install occupancy sensors $19,725 $23,544
UD1032 #06 Y:2021 Utilize energy-efficient belts and other improved mechanisms $4,104 -
UD1032 #05 Y:2021 Use optimum size and capacity equipment $14,725 $4,661
UD1032 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $68,929 $100,000
UD1032 #03 Y:2021 Install compressor air intakes in coolest locations $3,018 $10,000
UD1032 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $5,757 -