ITAC Assessment: UD1032
ITAC logo
ITAC Assessment: UD1032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Ethyl Alcohol Manufacturing
NAICS 325193: Ethyl Alcohol Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 62
Plant Area 500,000
ft2
Annual Production 131,998
Tgal
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,573,960 89,370,101
kWh
Electricity Demand $409,412 141,120
kW-mo/yr
Electricity Fees $5,562 -
Natural Gas $9,579,013 3,438,471
MMBtu
Waste Disposal Costs
Water Usage $408,547 102,137
Tgal
Water Disposal $388,891 20,275
Tgal
TOTAL YEARLY COSTS $14,365,385
RECOMMENDED SAVINGS* $526,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,033

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4113: Install motor voltage controller on lightly loaded motors $58,668 $25,875 $58,668
1,470,366
kWh
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,757 - $5,222
130,884
kWh
$535
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $3,018 $10,000 $2,745
68,648
kWh
$273
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $68,929 $100,000 $62,688
1,571,115
kWh
$6,241
-
kW-mo/yr
- - -
05 2.4323: Use optimum size and capacity equipment $14,725 $4,661 $12,697
318,216
kWh
$2,028
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,104 - $3,733
93,316
kWh
$371
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $19,725 $23,544 $14,216
355,478
kWh
$1,416
-
kW-mo/yr
- $1,575 $2,518
08 2.2414: Use waste heat from hot flue gases to preheat $351,582 $1,000,000 - - $351,582
-
MMBtu
- -
TOTAL RECOMMENDED $526,508 $1,164,080 $159,969
4,008,023
kWh
$10,864
-
kW-mo/yr
$351,582
-
MMBtu
$1,575 $2,518
TOTAL IMPLEMENTED $73,033 $100,000 $66,421
1,664,431
kWh
$6,612
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs