ITAC Assessment: DL0152
ITAC logo
ITAC Assessment: DL0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product EPDM Rubber Membranes
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 350,000
ft2
Annual Production 393,000
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,072,735 32,032,000
kWh
Electricity Demand $103,806 29,555
kW-mo/yr
Natural Gas $310,063 50,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $198,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $49,150 $85,250 $(-13,330.0)
(-205,150)
kWh
$(-1,570.0)
-
kW-mo/yr
$64,050
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $9,300 $34,100 - - $9,300
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,290 $69,750 $18,290
281,400
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $42,330 $164,300 $39,000
600,000
kWh
$3,330
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $8,400 $46,500 $6,050
93,060
kWh
$2,350
-
kW-mo/yr
-
06 2.2628: Utilize a less expensive cooling method $13,980 $92,000 $13,980
215,150
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $57,540 $1,325,000 $57,540
885,200
kWh
- -
TOTAL RECOMMENDED $198,990 $1,816,900 $121,530
1,869,660
kWh
$4,110
-
kW-mo/yr
$73,350
-
MMBtu
TOTAL IMPLEMENTED $118,160 $1,559,050 $114,830
1,766,600
kWh
$3,330
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs