ITAC Assessment: CO0237
ITAC logo
ITAC Assessment: CO0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Tofu, Tempeh
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 16,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 4,777
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,735 752,345
kWh
Natural Gas $39,958 11,482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $3,010 $3,630 - $3,010
-
MMBtu
02 2.2121: Increase amount of condensate returned $1,090 $2,500 - $1,090
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $680 $50 $680
26,377
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $340 $170 $340
6,448
kWh
-
05 2.2212: Use minimum safe oven ventilation $340 $750 - $340
-
MMBtu
06 2.2441: Preheat boiler makeup water with waste process heat $600 - - $600
-
MMBtu
07 2.4133: Use most efficient type of electric motors $330 $770 $330
6,155
kWh
-
08 2.2511: Insulate bare equipment $470 $1,090 - $470
-
MMBtu
TOTAL RECOMMENDED $6,860 $8,960 $1,350
38,980
kWh
$5,510
-
MMBtu
TOTAL IMPLEMENTED $6,860 $8,960 $1,350
38,980
kWh
$5,510
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs