6,119
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MS0472 #06 Y:2026 | 06 | 2026 | Turn off equipment when not in use | $9,021 | - |
n/a
|
| MS0472 #05 Y:2026 | 05 | 2026 | Install occupancy sensors | $277 | $1,946 |
n/a
|
| MS0472 #04 Y:2026 | 04 | 2026 | Reduce the pressure of compressed air to the minimum required | $4,205 | - |
n/a
|
| MS0472 #03 Y:2026 | 03 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $174 | - |
n/a
|
| MS0472 #02 Y:2026 | 02 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,104 | $4,093 |
n/a
|
| MS0472 #01 Y:2026 | 01 | 2026 | Moderate cooling tower outlet temperature | $1,553 | $248 |
n/a
|
| SJ0047 #04 Y:2026 | 04 | 2026 | Use optimum temperature | $2,016 | - |
n/a
|
| SJ0047 #03 Y:2026 | 03 | 2026 | Preheat boiler makeup water with waste process heat | $2,804 | $626 |
n/a
|
| SJ0047 #02 Y:2026 | 02 | 2026 | Reschedule and rearrange multiple-source heating systems | $12,716 | - |
n/a
|
| SJ0047 #01 Y:2026 | 01 | 2026 | Use battery storage for demand control | $32,563 | $178,188 |
n/a
|
| MZ0395 #06 Y:2026 | 06 | 2026 | Use solar heat to make electricty | $209,252 | $1,881,750 |
n/a
|
| MZ0395 #05 Y:2026 | 05 | 2026 | Use waste heat from hot flue gases to preheat | $11,132 | $80,000 |
n/a
|
| MZ0395 #04 Y:2026 | 04 | 2026 | Install occupancy sensors | $798 | $1,700 |
n/a
|
| MZ0395 #03 Y:2026 | 03 | 2026 | Analyze flue gas for proper air/fuel ratio | $2,954 | $1,000 |
n/a
|
| MZ0395 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $26,240 | - |
n/a
|
| MZ0395 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $2,493 | $600 |
n/a
|
| LT8445 #06 Y:2026 | 06 | 2026 | Install occupancy sensors | $5,585 | $462 |
n/a
|
| LT8445 #05 Y:2026 | 05 | 2026 | Use solar heat to make electricty | $3,325 | $45,179 |
n/a
|
| LT8445 #04 Y:2026 | 04 | 2026 | Turn off equipment when not in use | $1,818 | $1,302 |
n/a
|
| LT8445 #03 Y:2026 | 03 | 2026 | Modify facility to avoid excess maintenance costs | $15,500 | $3,029 |
n/a
|