Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,195

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0275 #07 Y:2026 Use heat pump for space conditioning $1,195 $14,500
DL0275 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $4,492 $4,837
DL0275 #05 Y:2026 Use proper thickness of insulation on building envelope $133 $125
DL0275 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,007 $5,500
DL0275 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $12,658 $19,500
DL0275 #02 Y:2026 Recover waste heat from equipment $7,918 $10,000
DL0275 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $27,007 $22,000
NT0070 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,626 $5,513
NT0070 #05 Y:2026 Install occupancy sensors $3,633 $630
NT0070 #04 Y:2026 Chill water to the highest temperature possible $6,625 -
NT0070 #03 Y:2026 Install automatic packing equipment $14,236 $5,179
NT0070 #02 Y:2026 Apply for tax-free status for energy purchases $27,500 $44,000
NT0070 #01 Y:2026 Use or replace with energy efficient substitutes $42,742 $169,941
UL2610 #09 Y:2026 Use solar heat to make electricty $11,785 $116,051
UL2610 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,565 $11,013
UL2610 #07 Y:2026 Install occupancy sensors $102 $386
UL2610 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,253 $315
UL2610 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $9,804 $6,617
UL2610 #04 Y:2026 Optimize plant power factor $5,290 $26,000
UL2610 #03 Y:2026 Reschedule plant operations or reduce load to avoid peaks $6,056 -