ITAC Assessment: MZ0402
ITAC logo
ITAC Assessment: MZ0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product phosphates and phosphoric acid
NAICS 325312: Phosphatic Fertilizer Manufacturing
SIC 2874: Phosphatic Fertilizers
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 1,000,000
ft2
Annual Production 93,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,613,044 16,787,876
kWh
Natural Gas $1,588,492 329,944
MMBtu
Waste Disposal Costs
Water Usage $281,710 58,616
Tgal
Water Disposal $590,776 56,005
Tgal
TOTAL YEARLY COSTS $4,074,022
RECOMMENDED SAVINGS* $171,798 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,451 $125 $3,451
35,951
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $8,255 $13,919 $8,255
85,680
kWh
-
03 2.7135: Install occupancy sensors $645 $415 $645
6,720
kWh
-
04 2.2622: Replace existing chiller with high efficiency model $29,481 $172,531 $29,481
307,105
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $940 - $940
9,759
kWh
-
06 3.3128: Utilize other methods to remove contaminants $129,026 $900,000 - $129,026
TOTAL RECOMMENDED $171,798 $1,086,990 $42,772
445,215
kWh
$129,026
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs