| Assessment Year | 2026 |
|---|---|
| Principal Product | phosphates and phosphoric acid |
| NAICS | 325312: Phosphatic Fertilizer Manufacturing |
| SIC | 2874: Phosphatic Fertilizers |
| Sales Range | $100 M to 500M |
| # of Employees | 150 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 93,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,613,044 | 16,787,876 |
kWh
|
$0.096 | |
| Natural Gas | $1,588,492 | 329,944 |
MMBtu
|
$4.81 | |
| Waste Disposal Costs | |||||
| Water Usage | $281,710 | 58,616 |
Tgal
|
$4.81 | |
| Water Disposal | $590,776 | 56,005 |
Tgal
|
$10.55 | |
| TOTAL YEARLY COSTS | $4,074,022 | ||||
| RECOMMENDED SAVINGS* | $171,798 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,451 | $125 |
$3,451
35,951
kWh
|
- | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $8,255 | $13,919 |
$8,255
85,680
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $645 | $415 |
$645
6,720
kWh
|
- | |
| 04 | 2.2622: Replace existing chiller with high efficiency model | $29,481 | $172,531 |
$29,481
307,105
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $940 | - |
$940
9,759
kWh
|
- | |
| 06 | 3.3128: Utilize other methods to remove contaminants | $129,026 | $900,000 | - | $129,026 | |
| TOTAL RECOMMENDED | $171,798 | $1,086,990 |
$42,772
445,215
kWh
|
$129,026 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs