ITAC Assessment: MZ0007
ITAC logo
ITAC Assessment: MZ0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Zic die castings
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 250,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,784
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,639 2,953,105
kWh
Natural Gas $233,854 58,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2514: Cover open tanks $2,560 - - $2,560
-
MMBtu
02 2.2442: Preheat combustion air with waste heat $10,000 $20,000 - $10,000
-
MMBtu
03 2.6231: Utilize controls to operate equipment only when needed $533 - $533
8,648
kWh
-
04 2.7122: Disconnect ballasts $27,567 $1,310 $27,567
419,604
kWh
-
05 2.7135: Install occupancy sensors $5,535 $3,250 $5,535
106,434
kWh
-
TOTAL RECOMMENDED $46,195 $24,560 $33,635
534,686
kWh
$12,560
-
MMBtu
TOTAL IMPLEMENTED $36,195 $4,560 $33,635
534,686
kWh
$2,560
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs