Assessment Year | 1997 |
---|---|
Principal Product | Cathodic Protection |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
200,000
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,321 | 2,503,810 |
kWh
|
$0.048 |
Electricity Fees | $982 | - |
|
- |
Natural Gas | $132,524 | 48,055 |
MMBtu
|
$2.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $146,742 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $140,932 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.112: Replace old machine with new automatic multi-station tool | $124,800 | $150,000 | - | - | $124,800 | |
02 | 3.4111: Use closed cycle process to minimize waste water production | $15,653 | $36,725 |
$(-2,574.0)
(-65,064)
kWh
|
$18,227
-
gal
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,810 | $5,000 |
$5,810
147,128
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $434 | $1,872 |
$434
11,137
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $45 | $40 |
$45
2,345
kWh
|
- | - | |
TOTAL RECOMMENDED | $146,742 | $193,637 |
$3,715
95,546
kWh
|
$18,227
-
gal
|
$124,800 | ||
TOTAL IMPLEMENTED | $140,932 | $188,637 |
$(-2,095.0)
(-51,582)
kWh
|
$18,227
-
gal
|
$124,800 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs