Assessment Year | 2004 |
---|---|
Principal Product | Fiber reinforced rubber hose |
NAICS | 326220: Rubber and Plastics Hoses and Belting Manufacturing |
SIC | 3052: Rubber and Plastics Hose and Belting |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
150,000
ft2
|
Annual Production | 9,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,156 | 4,659,100 |
kWh
|
$0.037 |
Electricity Demand | $91,821 | 12,347 |
kW-mo/yr
|
$7.44 |
Electricity Fees | $252 | - |
|
- |
Fuel Oil #2 | $120,000 | 14,000 |
MMBtu
|
$8.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $669 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3134: Shift from daytime to nighttime operation | $36,051 | $3,500 |
$23,883
-
kWh
|
$12,168
-
kW-mo/yr
|
- | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,108 | $200 |
$1,515
-
kWh
|
$6,593
-
kW-mo/yr
|
- | $(-2,000.0) | - | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $1,452 | $2,000 |
$1,427
44,742
kWh
|
$25
-
kW-mo/yr
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $2,897 | $2,750 | - | - |
$2,897
-
MMBtu
|
- | - | |
05 | 2.1133: Adjust burners for efficient operation | $2,802 | $1,000 | - | - |
$2,802
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $349 | $100 |
$524
16,440
kWh
|
$275
-
kW-mo/yr
|
- | $(-300.0) | $(-150.0) | |
07 | 2.7211: Clean and maintain refrigerant condensers and towers | $320 | $58 |
$320
10,031
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $49,979 | $9,608 |
$27,669
71,213
kWh
|
$19,061
-
kW-mo/yr
|
$5,699
-
MMBtu
|
$(-2,300.0) | $(-150.0) | ||
TOTAL IMPLEMENTED | $669 | $158 |
$844
26,471
kWh
|
$275
-
kW-mo/yr
|
- | $(-300.0) | $(-150.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs