ITAC Assessment: NC0305
ITAC logo
ITAC Assessment: NC0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fiber reinforced rubber hose
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 9,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,156 4,659,100
kWh
Electricity Demand $91,821 12,347
kW-mo/yr
Electricity Fees $252 -
Fuel Oil #2 $120,000 14,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3134: Shift from daytime to nighttime operation $36,051 $3,500 $23,883
-
kWh
$12,168
-
kW-mo/yr
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,108 $200 $1,515
-
kWh
$6,593
-
kW-mo/yr
- $(-2,000.0) -
03 2.7241: Install outside air damper / economizer on hvac unit $1,452 $2,000 $1,427
44,742
kWh
$25
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $2,897 $2,750 - - $2,897
-
MMBtu
- -
05 2.1133: Adjust burners for efficient operation $2,802 $1,000 - - $2,802
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $349 $100 $524
16,440
kWh
$275
-
kW-mo/yr
- $(-300.0) $(-150.0)
07 2.7211: Clean and maintain refrigerant condensers and towers $320 $58 $320
10,031
kWh
- - - -
TOTAL RECOMMENDED $49,979 $9,608 $27,669
71,213
kWh
$19,061
-
kW-mo/yr
$5,699
-
MMBtu
$(-2,300.0) $(-150.0)
TOTAL IMPLEMENTED $669 $158 $844
26,471
kWh
$275
-
kW-mo/yr
- $(-300.0) $(-150.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs