Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Petroleum lubricating oil and grease manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0677 #09 Y:2025 Insulate bare equipment $290 $446
WV0677 #08 Y:2025 Eliminate or reduce compressed air usage $1,244 $540
WV0677 #07 Y:2025 Develop a repair/replace policy $2,517 $12,170
WV0677 #06 Y:2025 Use flue gases to heat process or service water $3,254 $14,320
WV0677 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $6,687 $1,418
WV0677 #04 Y:2025 Establish a predictive maintenance program $7,107 $5,200
WV0677 #03 Y:2025 Upgrade controls on compressors $10,271 $5,515
WV0677 #02 Y:2025 Install occupancy sensors $15,762 $7,782
WV0677 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $19,491 $60,024
AM0935 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $877 $80
AM0935 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,018 $1,000
AM0935 #04 Y:2024 Cool compressor air intake with heat exchanger $4,309 $2,600
AM0935 #03 Y:2024 Minimize use of outside make-up air for ventilation except when used for economizer cycle $7,150 $4,260
AM0935 #02 Y:2024 Apply for tax-free status for energy purchases $143,300 $15,000
AM0935 #01 Y:2024 Increase amount of condensate returned $45,322 $95,400
LS2405 #06 Y:2023 Use fossil fuel powered generator during peak demand periods $129,015 $600,000
LS2405 #05 Y:2023 Replace existing equipment with more suitable substitutes $155,225 $550,000
LS2405 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $44,207 $25,301
LS2405 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,417 $135
LS2405 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $11,023 $50