ITAC Assessment: LS2405
ITAC logo
ITAC Assessment: LS2405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Lubricating Fluids
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 619,542
ft2
Annual Production 180,000,000
units
Production Hrs. Annual 4,625
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,329,976 16,276,800
kWh
Electricity Demand $156,020 37,317
kW-mo/yr
Natural Gas $265,295 92,803
MMBtu
TOTAL YEARLY COSTS $1,751,291
RECOMMENDED SAVINGS* $344,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $204,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $3,278 - $3,278
39,976
kWh
- - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $11,023 $50 $11,023
134,432
kWh
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,417 $135 $1,417
17,279
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $44,207 $25,301 $39,043
476,135
kWh
$5,164
-
kW-mo/yr
- - - -
05 4.652: Replace existing equipment with more suitable substitutes $155,225 $550,000 $4,525
55,181
kWh
- - $148,000 $2,700 -
06 2.3192: Use fossil fuel powered generator during peak demand periods $129,015 $600,000 - - $(-7,660.0)
-
MMBtu
- $1,675 $135,000
TOTAL RECOMMENDED $344,165 $1,175,486 $59,286
723,003
kWh
$5,164
-
kW-mo/yr
$(-7,660.0)
-
MMBtu
$148,000 $4,375 $135,000
TOTAL IMPLEMENTED $204,127 $575,436 $48,263
588,571
kWh
$5,164
-
kW-mo/yr
- $148,000 $2,700 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs